Project Name, Location and Completion Date |
Lead Agency and Client |
Services Provided |
Details of PIONEER Involvement |
|
JY Ranch Reclamation Project
Teton County, Wy.
Completed: Ongoing
|
Lead Agency:
Teton County, Wyoming
Client:
D.R. Horne & Company and Laurance S. Rockefeller Estate
|
Wildlife, wetland, and botanical
surveys, recreational trail planning, reclamation of
over 1100 acres, multi-agency permit coordination, and
document/map production
|
PIONEER was one of four primary
consultants in the conversion of the JY Ranch from a
private estate to being part of the National Park
System. Pioneer surveyed the 1100 acre estate for flora,
fauna, wetlands, special interpretive sites, and
potential recreation sites. Pioneer prepared detailed
technical reports, permit applications, and plans for
the various natural resources within the site.
|
Snake River Sporting Club (North Parcel)
Teton County, WY
Completed: |
Lead Agency:
Teton County, Wyoming
Client:
Snake River Sporting Club Development |
Teton County Environmental Analysis, including wildlife,
wetland and botanical surveys. |
PIONEER is responsible for writing the required Teton
County Environmental Analsys. |
Bald Eagle Monitoring at the Snake River Sporting Club
(South Parcel)
Teton County, WY
Completed: 2007 |
Lead Agency:
US Army Corps of Engineers
Client:
Snake River Sporting Club
Development
|
Monitoring of bald eagles and
nesting sites within the vicinity of the Snake River
Sporting Club |
PIONEER personnel monitored five nesting pair of bald
eagles within five miles of the project sites.
Monitoring was done daily during the nesting season
(February thru August) to protect the eagle from
disturbance during construction of a golf course and
housing development. |
|
Wetland Delineation Report
for Spanish Peaks Resort
Completed: February 2003
|
Lead Agency:
US Army Corp. of Engineers
Client:
Spanish Peaks Resort
|
Wetland delineation report including
maps and a mitigation site plan
|
Pioneer oversaw the delineation of a
site where the client had received a non-compliance and
enforcement notice by the EPA. Pioneer was able to get
the project back on track, appease the federal and state
agencies, and provide plans that were acceptable to all
parties.
|
|
Report on a live-trapping survey
for Preble’s Meadow Jumping Mouse (Zapus hadsonius
preblei) adjacent to Halligan Reservoir Larimer
County, Colorado
Completed:
January 2004
|
Lead Agency:
US Forest Service
Client:
AYRES Associates
|
Small mammal trapping for a species
listed as threatened by the FWS. Wetland delineation
using acceptable methods of the USACOE. Reports of the
findings and making recommendations
|
Pioneer
developed and implemented a strategic plan to survey the
proposed site for the presence of Preble’s Meadow
Jumping Mouse and wetlands using methods acceptable to
the USFWS and USACOE. Two reports were prepared for
Ayres Associates which were then provided to various
municipal agencies. Pioneer also provided aerial photos
of a proposed reservoir site.
|
|
A Discussion of Genetic Isolation,
Landscape Permeability, and Potential Solutions
Associated with Certain Wildlife Species at the Tejon
Ranch, Lebec, California
Completed:
October 2003
|
Client:
Tejon Ranch Company
|
Statistical analysis for species
habitat use and overlap, detailed analyses of species
permeability and use of movement corridors, making
estimates of feasibility of translocation and selective
fencing
|
PIONEER was hired to review all of
the environmental documents prepared by Tejon Ranch and
their various subconsultants. Pioneer prepared a
technical and detailed analysis of the habitat
permeability of a host of species native to the 270,000
acre ranch. Pioneer prepared other technical reports on
plans to capture and transplant mountain lions and to
preclude feral pigs from leaving the ranch property.
Pioneer served as an advisor to the president of the
company regarding permit acquisition and compliance with
environmental standards and permitting.
|
|
Elkhead Reservoir Expansion Project
Craig, Colorado
Completed: 2006
|
Lead Agency: US Fish and Wildlife Service
Client: Colorado River Water Conservation District |
Biological investigations and baseline studies for
eventual inclusion into a NEPA document. |
PIONEER is responsible for assessing the baseline
conditions at Elkhead Reservoir for vegetation,
wildlife, and wetlands resources. This work will
ultimately be compiled into a NEPA document. |
|
The Canyon Club
Teton County, Wyoming
Completed: Ongoing
|
Lead Agency:
US Army Corps of Engineers
Client: The Canyon Club
|
Biological investigations and NEPA compliance for
implementation of a Section 404 permit, compliance with
Teton County Land Use Regulations, and ESA compliance. |
As prime environmental contractor, PIONEER is completing
botanical, wildlife, water quality, impact assessment
for an Environmental Assessment and Habitat Conservation
Plan. The EA/HCP is being undertaken for the issuance
of an Incidental-Take permit pertaining to eagles
nests. Application for a 404 Permit is also included.
For the purpose of County regulatory requirements an
Assessment of Impacts analysis will also be completed.
|
|
Jackson Hole Mountain Resort Environmental Assessment
Teton Village, Wyoming
Completed: October 2000
|
Lead Agency: U.S. Forest Service,
Bridger-Teton National Forest
Client: U.S. Forest Service
|
Biological investigations and compliance documentation
for proposed expansion of the ski area. |
As prime contractor, PIONEER completed botanical,
wildlife, and wetlands surveys; socioeconomic, scenic,
and recreation analyses; impact assessment; NEPA
analysis and permitting for federal agencies; activities
to comply with section 404 of the Clean Water Act, the
Endangered Species Act, and the Clean Air Act; and all
other actions leading to completion of an EA.
|
|
Fall
Creek Associates
Teton
County, Wyoming
Completed: Ongoing
|
Lead
Agency: N/A
Client: Fall Creek Associates |
Application for a 404 Permit. |
Wetlands delineation and general wildlife inventory. |
|
Two
Rivers Ranch
Teton
County, Wyoming
Completed: January 2001
|
Lead
Agency: US Army Corps of Engineers
Client: Two Rivers Ranch
|
Wetlands delineation, Application for 404 permit, and
Environmental Analysis |
As
prime contractor, PIONEER completed an Environmental
Analysis which involved one of the most important
spawning areas for Snake River cutthroat troat.
PIONEER also assisted in planning so the project
conformed with environmental constraints. Bald Eagles,
moose, trumpeter swans and elk were major considerations
in this project. PIONEER conducted wetlands delineation
and prepared the 404 permit to the US Army Corps of
Engineers. |
|
Pederson Property Habitat Assessment
Pederson,Utah
Completed: July 2000 |
Client: Confidential Client |
Preparation of a baseline natural resource assessment. |
PIONEER was involved in the initial field reconnaissance
of species and habitats in a mountain environment for a
proposed large-scale recreational resort in a wilderness
setting. The plan emphasized integration limits between
proposed development concepts and natural resource
health. |
|
Killington Wildlife Management Plan, Killington, Vermont
Completed: April 2000 |
Client: Killington, Ltd. |
Preparation of a comprehensive wildlife management plan
for a designed wildlife mitigation area. |
Preparation of a long term management plan for rare
plant and animal communties with in the resort. The
plan integrated natural resource management with
mountain recreation development. |
|
Aspen Highlands Ski Area Expansion, Aspen, CO
Completed: November 1998 |
Lead Agency: U.S. Forest Service, White River National
Forest
Client: Aspen Skiing Company |
Biological investigations and compliance documentation
for proposed expansion of the ski area. |
As prime contractor, PIONEER completed botanical,
wildlife, and wetlands surveys; socioeconomic, scenic,
and recreation analyses; impact assessment; NEPA
analysis and permitting for state and federal agencies;
activities to comply with sections 404 and 401 of the
Clean Water Act, the Endangered Species Act, and the
Clean Air Act; and all other actions leading to
completion of an EIS. |
|
Sugarbush Ski Resort Environmental Impact Statement
Completed: June 1998 |
Lead Agency: US Forest Service, Green Mountain National
Forest
Client: Sugarbush Resort Holdings, Inc. |
Biological investigations and compliance documentation
for proposed expansion of the ski area. |
PIONEER prepared biological baseline studies and
affected environment analyses, impact assessments for
all resource disciplines, provided assistance on public
involvement processes, issues and alternative
development, and alternatives consideration for the
Proposed Improvement and Development EIS at Sugarbush
Resort. |
|
Sugarbush Ski Area Planning,
Sugarbush, VT.
Completed: October 97 |
Lead Agency: N/A
Client: Sugarbush Ski Area
|
Biological investigations, impact assessment and
mitigation, and resource management planning to assist
ski area in evaluating options for growth. |
As prime contractor, Dr. Hugie served as project manager
and principal in charge, coordinating and implementing a
number of fish and wildlife surveys, including a
detailed black bear survey, habitat analyses and similar
investigations, then incorporating findings into
evaluation of management options for Sugarbush's
owners. Prepared an EA for the Slide Brook
Transportation Lift and Associated Facilities. |
|
Vail Category III Expansion, Vail, CO
Completed: August 97
|
Lead Agency: U.S. Forest Service, White River National
Forest
Client: Vail Associates, Inc.
|
Biological investigations and compliance documentation
for expansion of the ski area. |
As prime contractor, PIONEER completed wildlife,
botanical, and wetlands surveys, NEPA analysis and
permitting for state and federal agencies, and all other
actions leading to completion of an EIS. |
|
Crested Butte Development, Crested Butte, CO
Completed: February 97 |
Lead Agency: U.S. Forest Service, Grand Mesa,
Uncompahgre and Gunnison National Forests
Client: Crested Butte Mountain Resort, Inc.
|
Biological investigations and compliance documentation
for expansion of the ski area. |
As prime contractor, PIONEER conducted the vegetation,
wildlife, and wetland surveys associated with updating a
1982 EIS covering planned development of the ski area. |
|
Castle Rock Point of Entry,
Castle Rock, UT.
Completed: November 96
|
Lead
Agency: U.S. Army Corps of Engineers
Client: Utah Department of Transportation |
Impact assessment and mitigation planning for the Castle
Rock Port-of-Entry site. |
Under
subcontract, PIONEER assessed potential natural resource
impacts and developed a wetland mitigation plan for the
construction of a new port of entry 14 miles west of
Evanston, WY. |
|
Central Valley Water Reuse Project, Salt Lake City, UT
Completed: Not completed; shelved by proponents in
mid-1996
|
Lead Agency: Central Utah Water Conservancy District and
Department of the Interior
Client: Central Valley Water Reclamation Facility and
Salt Lake County Water Conservancy District
|
Biological investigations, impact assessment and
mitigation planning, and compliance documentation for a
proposal to reuse treated effluent. |
As prime contractor, PIONEER was responsible for all
aspects of an EIS addressing a proposal by the Central
Valley Water Reclamation Facility to reuse treated
effluent—currently about 40,000 acre-feet per year—in
order to secure Central Utah Project funding for
required improvements to the treatment facility and for
any infrastructure necessary to reuse the effluent. The
primary issues addressed in the analysis were:
hydrology, wetlands, T&E species, recreation, land use,
water quality, and groundwater. |
|
Alaska Military Operating Area Improvement,
Anchorage, AK.
Completed: August 95 |
Lead
Agency: U.S. Department of Defense
Client: 11th Air Force |
Biological investigations and compliance documentation
for proposed improvements to MOAs used for training
maneuvers in Alaska. |
Under
subcontract, PIONEER was responsible for biological
impact assessment and for overall process review of this
major EIS. |
|
Telluride Ski Area Expansion,
Telluride, CO.
Completed: July 96
|
Lead Agency: U.S. Forest Service, Grand Mesa,
Uncompahgre and Gunnison National Forests
Client: Telluride Ski & Golf, Inc.
|
Biological investigations and compliance documentation
for proposed expansion of the ski area. |
As prime contractor, PIONEER completed wildlife,
botanical, and wetlands surveys, NEPA analysis and
permitting for state and federal agencies, activities to
comply with sections 404 and 401 of the Clean Water Act,
and all other actions leading to completion of an EIS. |